Run an inspection
Inspections live under Operations → Inspections. Each belongs to a contract and a property, and is best run on a tablet at the property.
Reading the list
Section titled “Reading the list”The list shows each inspection by property, type (check-in / check-out / interim), performed date and friendly status — so you can tell them apart. The detail header links to the property and the contract.
Perform the inspection
Section titled “Perform the inspection”- Open the inspection. Record meter readings (electricity, gas, water, heating) and key counts.
- Go room by room: for each item, mark its condition — New / Good / Fair / Poor / Damaged — and attach photos.
- Capture signatures from the parties present.
- Finalize to lock and sign the inspection; a PDF report can be generated.
Check-out → deposit
Section titled “Check-out → deposit”On a check-out, use Deposit deductions to turn damaged items into deductions on the contract’s deposit (the contract must already have a deposit). This is what makes move-out reconciliation fast and defensible.